73.7 F
Basseterre

Roads and Drains Division Activities for Monday, June 30, 2025

Date:

Basseterre, St. Kitts (MoPIEUDT NEWS) – Today will be another busy day for the team of the Roads and Drains Division of the Public Works Department on St. Kitts. Look out for them at the following locations:

  • Trinity – backfilling the retaining wall that was damaged during recent heavy rain.
  • Half Moon – preparing to cast a wing wall that was damaged by heavy rain.
  • The Southeast Peninsula – trimming overgrown hedges that extend to the road.

The Public Works Department urges drivers and pedestrians to exercise caution when travelling through these areas.

For more information from the Public Works Department, visit mopieudt.gov.kn and follow the department’s Facebook page.

Related articles

PWD Road Tracker – March 11, 2026

Basseterre, St. Kitts (Public Infrastructure News) – On Wednesday, March 11, 2026, the Roads and Drains Division of the Public Works...

PWD Road Tracker – March 10, 2026

Basseterre, St. Kitts (Public Infrastructure News) – On Tuesday, March 10, 2026, the Roads and Drains Division of the Public Works...

PWD Road Tracker – March 6, 2026

Basseterre, St. Kitts (Public Infrastructure News) – On Thursday, March 5, 2026, the Roads and Drains Division of the Public Works...

PWD Road Tracker – March 4 – 5, 2026

Basseterre, St. Kitts (Public Infrastructure News) – The Roads and Drains Division (R&D) of the Public Works Department (PWD)...
Call Now Button