PWD Tracker for July 12 – 14, 2025

Date:

Basseterre, St. Kitts (MoPIEUDT NEWS)The Roads and Drains (R&D) Division of the Public Works Department (PWD) in the Ministry of Public Infrastructure, Energy, Utilities, and Domestic Transport continues its work at multiple locations on the island. See its most recent activities below:

ActivityLocationDateStatus
Road pavingBird Rock Road, BasseterreJuly 12, 2025Complete
Road patchingPomp Bay, Sandy PointJuly 13, 2025Complete
Road patchingSide street adjacent to Bourkes Road, Sandy PointJuly 14, 2025Ongoing
Drain WorkGeorge Street, BasseterreJuly 14, 2025Ongoing

The R&D thanks the public for its patience and cooperation.

For more information from the Public Works Department, please visit mopieudt.gov.kn and follow the PWD on Facebook.

Related articles

PWD Road Tracker – March 11, 2026

Basseterre, St. Kitts (Public Infrastructure News) – On Wednesday, March 11, 2026, the Roads and Drains Division of the Public Works...

PWD Road Tracker – March 10, 2026

Basseterre, St. Kitts (Public Infrastructure News) – On Tuesday, March 10, 2026, the Roads and Drains Division of the Public Works...

PWD Road Tracker – March 6, 2026

Basseterre, St. Kitts (Public Infrastructure News) – On Thursday, March 5, 2026, the Roads and Drains Division of the Public Works...

PWD Road Tracker – March 4 – 5, 2026

Basseterre, St. Kitts (Public Infrastructure News) – The Roads and Drains Division (R&D) of the Public Works Department (PWD)...
Call Now Button