75.7 F
Basseterre

PWD’s Activities for June 19, 2025

Date:

Basseterre, St. Kitts (MoPIEUDT NEWS) – The Roads and Drains Division of the Public Works Department (PWD) will be engaging in several activities on Thursday, June 19, 2025, as it maintains and improves the island’s roadways.

The team will be trimming hedges along the roadway at the South East Peninsula.

In Half Moon, the team will continue its work to reinforce a section of the roadway that recent rain has undermined.

In Boyds, the team will be working on a retaining wall to strengthen the area’s resistance to degradation from the impact of flooding.

The PWD asks drivers and pedestrians to exercise caution when travelling through these areas.

For more information from the PWD, visit mopieudt.gov.kn and follow PWD on Facebook.

Related articles

PWD Road Tracker – April 27, 2026

Basseterre, Saint Kitts (Public Infrastructure News) – The Roads and Drains Division of the Public Works Department (PWD) will...

Notice of Roadwork at New Road Boulevard

Basseterre, Saint Kitts (Public Infrastructure News) - The Ministry of Public Infrastructure, Energy, and Utilities, through the Roads...

PWD Road Tracker – April 20, 2026

Basseterre, Saint Kitts (Public Infrastructure News) – The Roads and Drains Division of the Public Works Department (PWD) will...

Browse the PWD Road Tracker for April 13, 2026

Basseterre, St. Kitts (Public Infrastructure News) – The Roads and Drains Division of the Public Works Department (PWD) continued...
Call Now Button